Industrial Floor Painting and Epoxy Floor Coatings in Birmingham

Hard-wearing epoxy and industrial floor coatings, applied in phases so your site keeps working.

5/5 · 21 Google reviews
27+ Years in the TradeExperienced decorators
DBS-Checked PaintersFully insured
Free Written QuotesAfter a site visit
Clean and TidyFloors and furniture protected

PDS Painting Birmingham applies epoxy floor coatings and industrial floor painting to concrete floors in warehouses, factories and workshops across Birmingham. It’s a specialist part of our commercial painting and decorating work, for floors that need to be hard-wearing, easy to clean and free of concrete dust.

A floor coating stands or falls on the concrete underneath. Get the preparation wrong and even a good epoxy can lift under the first forklift. That’s why every quote states the coating system, the preparation method, and the cure and return-to-use times, so you know how long each area will be out of action.

Floors We Coat

These are the floors we’re usually asked about, and what each one has to put up with:

  • Warehouses and distribution units - pallet trucks, forklifts and constant traffic in and out.
  • Factories and production areas - foot traffic, spills and regular cleaning.
  • Workshops and vehicle workshops - oil drips, tyre marks and dropped tools.
  • Storage units, plant rooms and back-of-house areas - lighter traffic, where dust control and easy cleaning matter most.

If you have a different kind of floor in mind, describe it when you get in touch and we’ll tell you honestly whether it’s a job we can take on.

Choosing a Floor Coating System

The right system depends on what drives over the floor, what gets spilled on it and how much downtime you can allow. These are the main options:

SystemTypical useTrafficNotes
Single-pack floor paintStores, plant rooms, light-use areasLight foot trafficQuickest and lowest cost, but the least durable
Water-based epoxyWorkshops, light industrial areasFoot traffic and light pallet trucksTougher than floor paint; a thinner film than high-build systems
Solvent-free or high-build epoxyWarehouses and production areasForklifts and heavy pallet trafficThicker film and stronger chemical resistance
Epoxy with anti-slip aggregateWet areas, ramps, loading baysFoot and vehicle trafficTextured surface for grip; takes a little more effort to clean
Polyurethane topcoat over epoxyAreas where appearance and scratching matterVaries with the base systemEpoxy can yellow in sunlight; a topcoat adds UV and scratch resistance

At the survey we’ll recommend a system for each area and name the product on the quote. We apply floor coatings by roller and squeegee, not spray.

The Resin Flooring Association (FeRA) groups resin floors into types, from thin floor seals up to thick, heavy-duty screeds, and the systems above sit at the coating end of that range. For a plain-English overview, read epoxy floor coatings explained.

Preparation: Why Floor Coatings Fail and How We Prevent It

Adhesion depends on the concrete, not the paint. Most coatings that peel were put down on dusty, oily, damp or previously sealed concrete. This is how a floor is made ready:

  1. Survey. Check the slab for moisture, old coatings, oil and other contamination.
  2. Mechanical preparation. Open up the surface so the coating has something to key into. Smooth, power-floated or sealed concrete usually needs grinding or blasting, and the method for your floor is written into the quote.
  3. Degrease. Treat oil-soaked areas so the coating can bond.
  4. Repair. Fill cracks, holes and damaged joints with a suitable repair material.
  5. Clean. Vacuum until the floor is completely free of dust.
  6. Prime and coat. Apply the primer, then the coating system, within the manufacturer’s overcoating times.

New concrete has to wait. It needs to cure and dry before it can be coated - commonly quoted as at least 28 days, and often longer before the slab is dry enough. The coating manufacturer’s guidance decides, and moisture is checked before any coating goes down.

Slip Resistance and Line Marking

A smooth gloss epoxy looks smart but can be slippery when wet. Where floors get wet, oily or sloped - ramps, loading bays, wash-down areas - anti-slip aggregate can be broadcast into the coating for grip. Where floors stay dry and cleaning matters most, a smoother finish is easier to look after.

The Health and Safety Executive’s slips guidance uses the pendulum test, and a pendulum test value (PTV) of 36 or above is treated as low slip potential. When you compare coatings, ask about wet-slip performance, not just how the floor looks. Measured slip testing is a separate, specialist service, so plan for it if your site needs a recorded result.

Many sites also want walkways, forklift routes, bays and hazard areas marked out in contrasting colours. If you need floor markings, send the layout with your survey request and we’ll confirm in writing what can be included with the coating.

Downtime, Curing and Phased Working

The first question most operations managers ask is how long the floor will be out of use. The answer depends on the system, the temperature and how the work is split up.

Large floors are usually coated in zones or bays, so the rest of the site keeps running. If you can’t spare a weekday, the work can be planned for weekends or a shutdown, using the same out-of-hours and phased commercial painting approach we use on walls and ceilings.

A typical sequence runs: a preparation day, then each coat within the product’s overcoat window, then a spell of light foot traffic only, and finally full vehicle traffic. Cold, unheated units slow the cure, so a winter job can take longer than the same floor in summer. The timings for your floor come from the product data sheet and are written into the quote.

Health, Safety and Site Requirements

Epoxy resins and hardeners are hazardous substances, so they’re handled under the Control of Substances Hazardous to Health Regulations 2002 (COSHH). During application and cure, the area is kept ventilated and exclusion zones are set up so nobody walks across wet coating.

Tell us what your site needs before it can approve a contractor - risk assessments, method statements, safety data sheets - and we’ll confirm with the quote what we’ll provide. Our team is DBS-checked and we’re insured for the work.

What Affects the Cost of an Epoxy or Industrial Floor?

Floors are quoted per job after a survey, and the price is fixed in writing. The main factors are:

  • The floor area
  • The condition of the concrete and how contaminated it is
  • The preparation method needed
  • The coating system and film thickness
  • Anti-slip finishes and any floor markings
  • Out-of-hours or phased working

You can see more of our work on our projects page.

Request an Industrial Floor Survey

Call 0121 752 9229 or book a floor survey. Tell us the floor area, its condition, what traffic it takes and when it can be out of use, and we’ll arrange a visit.

Industrial Floor Painting Questions

How long does an epoxy floor take to cure before we can use it?

It depends on the product and the temperature. Light foot traffic always comes before vehicle traffic, and cold, unheated buildings slow the cure down. The timings for your floor come from the product's data sheet and are written into the quote, and we coat in zones where we can so the rest of the site keeps working.

Can you coat a floor that has been painted before?

Often, yes, as long as the old coating is sound, well bonded and compatible with the new system. Loose, flaking or incompatible coatings have to be removed first. The survey decides which applies to your floor, and the quote sets out the preparation included.

Is an epoxy floor slippery when wet?

A smooth gloss coating can be, especially with water or oil on it. Where floors get wet or oily, anti-slip aggregate is added to the coating for extra grip. Tell us at the survey where spills and wash-downs happen, so the right finish goes in the right place.

Can you paint a new concrete floor?

Not straight away. New concrete has to cure and dry before it can be coated. Follow the coating manufacturer's guidance, which commonly means at least 28 days and often longer for the slab to dry out. We check the floor for moisture before any coating goes down.

Does the floor need to be cleared before you start?

Yes. Each zone has to be empty of stock, pallets and equipment while it's prepared, coated and left to cure. Fixed items such as racking or machinery are discussed at the survey. Phasing the job means you only need to clear one area at a time.

Do you spray floor coatings?

No. We apply floor coatings by roller and squeegee, not spray. That keeps the work contained to the zone being coated, which matters on a site that's still operating around it, and it suits the thicker coatings used on busy industrial floors.